Secondary dwellings · Backyards across Sydney

Sydney Granny Flat Builder

The most affordable new dwelling most Sydney households will ever add is the one behind the house they already own. NSW planning policy treats granny flats as secondary dwellings with their own streamlined rules, commonly capped around sixty square metres of living space, and on qualifying lots the approval can move through a certifier rather than a council queue. Whether the goal is rent, family housing or a home office that pays its way, the project starts with whether your lot qualifies.

Dwelling type
Secondary dwelling on an existing lot
Typical approval
Complying development certificate
Coverage
Greater Sydney suburbs

Granny flat services

From spare yard to keys in a second front door

Straight answers

Granny flat questions

Does my property qualify for a granny flat?

Qualification turns on zoning, minimum lot size, and whether a complying design can meet the setback, open-space and site-coverage tests on your block. Physical factors (sewer position, protected trees, access) matter just as much in practice. A property-specific check against the current provisions is the only dependable answer.

How big can a granny flat be?

The secondary dwelling provisions commonly cap the living area at around sixty square metres, with garages, patios and awnings treated separately under the applicable controls. Within that envelope, careful design comfortably delivers two bedrooms, the layout matters far more than the raw number.

Do I need to go through council?

Not always. Proposals meeting the codified standards can be approved as complying development by a registered certifier, which is generally the quicker and more predictable route. Lots or designs outside those standards, and properties in certain overlay areas, proceed by development application to the local council instead.

Can I rent the granny flat out?

In NSW, secondary dwellings can generally be rented separately from the main house, which is precisely why they anchor so many household investment plans. The property remains one title, a granny flat cannot be subdivided off and sold separately, and tenancy law obligations apply to the landlord like any other rental.

Can my existing garage become a granny flat?

Sometimes, and the assessment is worth doing honestly. A conversion must reach habitable dwelling standards: ceiling heights, damp-proofing, insulation, ventilation, fire separation and compliant wet areas, and some garages get there economically while others cost more to upgrade than a new compact build. The structural report tells you which one you own.

Will the flat disturb the main house during construction?

The build happens in your backyard, so there is honest disruption: trenching across the yard, trade access through the side, and noise during structural stages. A well-run program contains it with agreed access hours, protected paths and staged reinstatement of the garden, and detached builds leave the main house itself untouched.

A backyard build puts a working site inside a family property: keep children and pets away from trenches, stacked materials and the work zone even outside work hours, and never use ladders or scaffolds left on site. Flag any open excavation or unsecured fencing to the site contact the moment you see it.

Where backyards work hardest

Sydney regions built for secondary dwellings

Yard depth, lot size and rental demand differ across the city, and they decide both what fits behind your home and what it can earn. Find your region below.

How it works

The secondary dwelling pathway

  1. 01

    Qualify the lot

    The property is checked against the secondary dwelling provisions and the physical realities (services, trees, access) before anything is drawn.

  2. 02

    Design to the envelope

    A compact dwelling is designed within the permissible size and siting limits, shaped around who will actually live in it.

  3. 03

    Approve on the right track

    Qualifying proposals move as complying development through a registered certifier; the remainder proceed by development application to council.

  4. 04

    Build and hand over

    Construction, connections and inspections run through the backyard program to an occupation certificate and a dwelling ready for family or tenants.

Granny flat services

Tell us about the job

Send through the job details and we'll connect you with a licensed provider who can quote this work.

If this is an emergency or anyone is at immediate risk, contact the relevant emergency service or your network or utility operator directly instead of using this form.